Procurement of equipment and materials for MV and LV networks

Getting cables, accessories, junctions and substations to site is half the battle. We procure supplies to the design and the operator's requirements — as part of the works we deliver, or as a stand-alone service for developers and general contractors.

Why it matters

The right material on site on the right day

On a cable line job, a late cable drum or a missing set of joints means crews standing idle and an outage date that has to be renegotiated with the operator. Material that does not meet the DSO's requirements may be rejected at acceptance. That is why we treat procurement as part of planning the works, not as a separate purchasing problem.

We start from a materials schedule based on the design and bill of quantities, compare it with the requirements of the operator whose network the scheme connects to, and agree delivery dates with manufacturers and distributors. Long-lead items — above all transformer substations and MV switchgear — are ordered first so they do not hold up the programme.

We deliver and unload material on site with our own transport: a Volvo FE 320 with an HMF 2120 loader crane carries cable drums, junctions and ducts, and works alongside our Tesmec ARS405 hydraulic puller when cable is being pulled in.

We offer procurement in two ways. In the first it is part of our contract — we are responsible for both the material and its installation, so the client has a single partner at the supply–installation interface. In the second we procure for a developer or general contractor who has the installation done by another firm or its own crews. Either way, the starting point is the design and the operator's requirements, and the goal is a complete, documented delivery on the date the programme demands.

  • Materials schedule from the design and bill of quantities
  • Checking compliance with the network operator's requirements
  • Delivery dates coordinated with the works programme
  • Transport and unloading with our own crane truck
Volvo truck with a loader crane carrying a cable drum
Moving a cable drum with our crane truck — BIGBUD

Range

What we typically procure

The scope of supply always follows the design. These are the groups of materials and equipment that come up most often on MV and LV network jobs.

GroupExamplesWhat we check
MV cablesXRUHAKXS, NA2XS(F)2Y 1×120…1×240 mm², aluminium conductors, copper screensConductor and screen size, drum lengths, DSO requirements
LV cables4-core aluminium cables, e.g. 4×150 mm², 4×25 mm²Consistency with the service and junction design
MV cable accessoriesStraight joints, indoor, outdoor and connector (separable) terminationsMatch to cable type and size, complete kits
Cable junctionsZKSN-type MV junctions, ZK-type LV junction cabinetsNumber of ways, fit-out, bases, operator requirements
Transformer substationsContainer (kiosk) and pole-mounted MV/LV substations, transformers, MV and LV switchgearLead time, transport and craneage, manufacturer documentation
DuctsCorrugated and smooth protective ducts, HDPE ducts, SRS pipes for pipe jackingDiameters and strength for bores and crossings
AncillariesWarning tape, cable markers, sand and bedding, earthing materialsCompliance with the design and acceptance details

How we do it

Procurement in practice

Schedule from the design

We check quantities, cable lengths with allowances for joints and terminations, and the number of junctions, ducts and accessories.

DSO compliance

Every operator has its own requirements for materials and equipment. We check them before ordering, not at acceptance.

Dates that fit the programme

Deliveries are phased — what is needed first arrives first; long-lead equipment is ordered well ahead.

Own transport

The Volvo FE 320 with its loader crane moves and unloads drums, junctions and ducts without hiring a crane for smaller items.

Receipt and storage

We check deliveries against the paperwork, secure material on site and keep track of usage.

Documentation

We collect the manufacturers' declarations and documents needed for acceptance and handover into service.

Process

From schedule to installation

01

Design review

We verify the materials schedule in the design and bill of quantities, check the operator's requirements and any possible equivalents.

Scope of works

  • Design review
  • Materials list

Result

  • Supply schedule
02

Enquiries and supplier selection

We collect offers from manufacturers and distributors, compare lead times and parameters, and agree any equivalents with the client and the designer.

Scope of works

  • Supplier enquiries
  • Agreeing equivalents

Result

  • Suppliers selected
03

Orders and delivery plan

Orders are placed in the sequence set by the works programme and equipment lead times.

Scope of works

  • Purchase orders
  • Delivery plan

Result

  • Confirmed dates
04

Delivery and receipt

We receive deliveries on site or at our base, check them against the order and documents, and move material to the work front.

Scope of works

  • Quantity and quality checks
  • Crane-truck transport

Result

  • Material on site
05

Installation and reconciliation

Material goes into the works — installed by our crews or a contractor chosen by the client. We reconcile usage and hand over the documentation.

Scope of works

  • Installation
  • Materials reconciliation

Result

  • Supply documentation for acceptance

Photos

From our sites

FAQ

Procurement — frequently asked questions

Do you procure supplies without doing the works?

Yes, we can prepare and deliver the supplies for a job installed by another contractor. Most often, though, we combine supply with the works — then we are responsible for the whole and there are no disputes at the supply–installation interface.

Do you supply transformer substations?

We procure container and pole-mounted MV/LV substations from manufacturers, to the design and the operator's requirements, and can install them. More on the MV/LV substations page.

How do you know the material meets the operator's requirements?

The requirements are set by the operator whose network the scheme connects to, and by the design. We compare the materials schedule with them before ordering; any equivalents are agreed with the client and the designer.

Which MV cables do you use most?

On our contracts these have included XRUHAKXS 1×150 mm², 1×240/25 and 1×240/50 mm², and NA2XS(F)2Y 1×150/25 mm². The differences are explained in MV cables: XRUHAKXS and NA2XS(F)2Y.

Do you publish material prices?

No. Cable and equipment prices change often, so we price each supply individually from the schedule and the required date. Send a request for quotation.