Fibre-optic ducts — trenching, drilling, ducts and chambers

We build the duct networks that fibre-optic cables run through: from setting out the route, through trenching and directional drilling, to laying HDPE ducts and microducts, installing chambers and the as-built survey. With the same plant and the same site organisation we use on MV cable lines.

What the service involves

Linear works are our daily bread — telecoms included

A fibre duct network is an underground system of ducts and chambers into which optical cables are later installed, usually by blowing. The quality of this backbone decides whether the cable can be blown over the design length, whether the network can be extended later and whether the operator will have to dig up the road verge again in a few years' time.

From a civil-works point of view, fibre ducting is very close to what we do on medium-voltage cable lines: a route in the road verge or across private land, crossings with roads, ditches and other utilities, directional drilling, reinstatement and an as-built survey. That is why we carry it out with our own crews and our own plant — a CAT 302.7 mini excavator, a CAT 432 backhoe loader, a GRUNDODRILL 15 XPT directional drill and a Volvo truck with a loader crane.

We often lay fibre ducts alongside the construction or rebuild of a power network: a shared trench and a single site organisation cut costs and shorten the time the road is occupied. We can also deliver ducting as a stand-alone job for a telecoms operator or a general contractor.

  • HDPE ducts (e.g. 40 mm) and microduct bundles
  • Cable chambers and joint boxes, sleeve ducts at crossings
  • Horizontal directional drilling under roads, railways and watercourses
  • Proving and pressure tests, as-built survey
Cable protection ducts ready to be laid in a trench
Protective ducts and cable ducting — illustrative photo

Scope

What we deliver on a fibre duct project

Setting out and route survey

Survey set-out, locating existing utilities and, where needed, trial holes before heavy plant moves in.

Open-cut trenching

Machine and hand digging near live services, bedding, laying ducts at design depth, backfilling and compaction.

Directional drilling

Crossing roads, driveways, railways, ditches and watercourses without open cut — with our own rig. Details on the directional drilling page.

Ducts and microducts

Laying HDPE ducts, sleeve ducts and microduct bundles, jointing with couplers, sealing and marking the route with warning tape.

Cable chambers

Installing chambers and joint boxes where the design calls for them — at changes of direction, branches and blowing points.

Testing and records

Duct proving and pressure tests, reinstatement, as-built survey and the documentation needed for handover.

How the works run

Building a duct network, step by step

The sequence is broadly the same on any linear job. Below is a typical run of works — the details always follow the design and the conditions set by landowners and road authorities.

01

Design review and pricing

We review the design, bill of quantities and maps, and check ground conditions, access and crossing points on site. On that basis we propose the method (open cut or drilling) and a programme.

Scope of works

  • Checking the route and clashes
  • Choosing drilling locations
  • Quotation with programme

Result

  • Price and works plan
02

Pre-start formalities

We prepare the temporary traffic management, notify road authorities and landowners of the start of works, agree reinstatement requirements and access to private plots.

Scope of works

  • Traffic management design and set-up
  • Liaison with authorities
  • Ordering materials

Result

  • Ready to mobilise
03

Setting out the route

The surveyor sets out the route and chamber positions. Existing services are located from maps and — where the maps are doubtful — by trial holes.

Scope of works

  • Survey set-out
  • Utility location

Result

  • Route marked on site
04

Trenching, drilling and duct laying

We trench in sections and lay the ducts straight away, so trenches are not left open. Obstacles that cannot be dug through are crossed by directional drilling, pulling the sleeve or the duct itself in behind the reamer.

Scope of works

  • Machine and hand digging
  • HDD crossings
  • Laying ducts and installing chambers

Result

  • Duct network in the ground
05

Backfill and reinstatement

We backfill and compact in layers, lay warning tape and reinstate surfaces and land to the standard agreed with the owner or authority.

Scope of works

  • Compaction
  • Surface and verge reinstatement

Result

  • Land restored
06

Testing, survey and handover

We prove and pressure-test the ducts, carry out the as-built survey and compile the documentation the client needs for acceptance.

Scope of works

  • Proving and pressure tests
  • As-built survey
  • Handover documentation

Result

  • Ducts ready for cable blowing

Method

Open cut or directional drilling?

We use both every day and often combine them on one route. A general comparison:

CriterionOpen cutDirectional drilling (HDD)
Typical useVerges, farmland and green areas, unobstructed sectionsRoads, driveways, railways, ditches and watercourses, wooded areas
Ground disturbanceWhole route excavated, reinstatement requiredLaunch and reception pits only
Traffic disruptionUsually greater, depends on section lengthMinimal — the road stays open
Clash controlDirect — services are visible in the trenchNeeds a thorough route survey before drilling

Photos

From our sites

FAQ

Fibre-optic ducts — frequently asked questions

Do you blow and splice the fibre as well?

Our speciality is the civil works: trenching, drilling, ducts, chambers and reinstatement. Cable blowing, splicing and optical testing are usually done by a specialist telecoms contractor — we agree the split of scope case by case.

Can you lay fibre ducts in a shared trench with an MV or LV cable?

Yes, if the design provides for it and both network owners agree. A shared trench must respect the separations and laying arrangement set out in the design and in the operators' requirements.

How long can your drilled crossings be?

The length of a single bore depends on the ground, the duct diameter and site conditions. Send us the profile and a description of the obstacles and we will confirm the method. More in How directional drilling works.

Who deals with the road authority?

Permits to place ducts in the road corridor are normally obtained by the client at the design stage. We prepare traffic management for the works, notify the start on site and reinstate surfaces to the authority's conditions.

Do you work as a subcontractor to telecoms operators?

Yes. We can take on all the civil works on a section or just part of them, e.g. only the road crossings. See also the page for general contractors.

Where do you work?

Across Poland. Our office is in Kraków and we move our plant with our own crane truck.